Mibrag Consulting International - Projects

Projects – CIS

Technical and economic comparison of open-pit mine

Map of Russia

Country: Russia

Time period: 2014–2015

Commodity: Chalk

Task:
  • Technical and economic evaluation of different mining scenarios
  • Comparison of different chalk extraction methods (drill, blast and surface mine operation)
  • Assessment of different mining extraction methods of other materials (clay etc.)
  • Economic evaluation of different transportation scenarios (train vs truck vs conveyor belt)
  • Analysis of blending and stockyard operations

Technical study and engineering support during planning and operating a new overburden handling system

Map of Russia

Country: Russia

Time period: 2019–2021

Commodity: Phosphate ore

Task:
  • Technical study of installation status of a new overburden handling system
  • Theoretical and practical training of spreader operators in Russia and Germany
  • Theoretical and practical training on conveyer belt shifting in Russia and Germany
  • Support in purchasing equipment for belt shifting
  • Support and supervision of conveyer belt shifting

Development of conceptual crushing solutions for a processing plant

Map of Russia

Country: Russia

Time period: 2019

Commodity: Phosphate ore

Task:
  • Development of conceptual crushing solutions for technical crushing system
  • General layout plan for the new crushing complex infrastructure as well as an alternative option
  • Call for Tenders from equipment suppliers
  • Estimation of CAPEX for the crushing complex construction
  • Estimation of OPEX and the average cost of 1 ton of crushed ore

Technical due diligence of a bankable feasibility study for an iron ore greenfield project

Map of Kazakhstan

Country: Kazakhstan

Time period: 2013

Commodity: Iron ore

Task:
  • Analysis of geological and hydrogeological deposit conditions
  • Analysis and assessment of technical and technological solutions
  • Evaluation of options for iron ore beneficiation plant
  • Estimation of CAPEX and OPEX for pit operation and beneficiation plant
  • Risk analysis for project execution phase
  • Verification of project solutions in accordance with Kazakh legislation

Study for implementation of IPCC for in pit dumping at the Komarovsky deposit

Map of Kazakhstan

Country: Kazakhstan

Time period: 2021-2022

Commodity: Gold

Task:
  • Review of hydrological and hydrogeological reports, geological modeling and development strategy
  • Development of mine planning and different dump development scenarios
  • Definition of main mining equipment (crushers, conveyors, spreaders)
  • Description of power supply, auxiliary equipment, mining infrastructure and staff
  • Economic Modeling

Interested in working together?

Fill in the contact form and feel free to contact us any time.

Like us on LinkedIn and say “hello”.